Seal Coating in Smith Point, NY

Protect Your Asphalt Investment Today

Professional seal coating that extends your pavement’s life and saves you thousands in replacement costs.

A person is applying grey tile adhesive with a notched trowel, laying large rectangular tiles in a staggered pattern. Red spacers are visible between the tiles.

Hear from Our Customers

A construction worker in a gray hoodie and gloves is bending over, placing rectangular paving stones on the ground to build a sidewalk or patio. Tools and construction materials are visible in the background.

Professional Asphalt Sealing Services

What Proper Sealcoating Does for You

Your asphalt doesn’t have to crack and fade within a few years. When done right, seal coating creates a protective barrier that keeps water out, prevents oil stains from setting in, and stops small surface issues from becoming expensive problems.

You’ll see the difference immediately – that rich, dark finish that makes your property look well-maintained and professional. More importantly, you’ll feel the difference in your wallet. Properly sealed asphalt can last 3-5 years longer than untreated surfaces, which means you’re looking at significant savings over time.

The freeze-thaw cycles here in Smith Point are brutal on unprotected pavement. Seal coating gives your asphalt the defense it needs against our coastal weather, salt exposure, and daily wear. Your driveway or parking lot stays functional, safe, and attractive for years longer than it would otherwise.

Smith Point Sealcoating Experts

We Know Long Island Asphalt

We’ve been protecting asphalt surfaces across Long Island for years. We understand what Smith Point’s coastal climate does to pavement – the salt air, the winter freeze-thaw cycles, the summer heat that can make cheap sealers fail.

We’re not the guys who show up with a bucket and a squeegee. Our crew uses professional-grade materials and commercial equipment because we’ve seen what happens when sealcoating is done wrong. You get peeling, uneven coverage, and surfaces that look worse than when you started.

When you work with us, you’re getting a team that knows the difference between a quick fix and a real solution. We’ve been doing this long enough to know what works in our area and what doesn’t.

Stacks of gray concrete paving stones on the ground next to an unfinished pathway, with some pavers already laid in place; yellow sand and soil are visible nearby.

Our Seal Coating Process

Here's How We Protect Your Asphalt

First, we clean your asphalt thoroughly. Any oil stains, debris, or loose material has to go before we can apply sealer. We’re not just hosing it down – we’re making sure the surface is ready to bond properly with the sealcoating material.

Next, we fill any cracks or holes. There’s no point in sealing over problems that will just get worse. We address these issues first so your seal coating can do its job effectively.

Then we apply the sealcoating using professional spray equipment for even coverage. This isn’t the brush-on approach some companies use. We’re putting down a consistent, protective layer that will cure properly and last. The whole process typically takes a few hours, depending on the size of your surface.

You’ll need to stay off the sealed area for 24-48 hours while it cures. After that, you’ve got a protected surface that should serve you well for several years.

Three construction workers in work clothes and kneepads stand on a partially completed outdoor stone patio near steps, with tools and a black toolbox nearby. Their upper bodies are mostly out of frame.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Complete Driveway Sealing Service

What's Included in Our Service

You get thorough surface preparation, crack filling where needed, and professional-grade sealcoating application. We bring our own equipment and materials – no shortcuts or cheap alternatives that fail after one winter.

We also handle the timing. Sealcoating needs the right weather conditions to cure properly. Too hot, too cold, or rain in the forecast can ruin the job. We schedule your service when conditions are optimal, not just when it’s convenient for us.

Our sealcoating material is designed for Long Island’s climate. It handles the temperature swings, resists salt damage, and maintains flexibility so it won’t crack when your asphalt expands and contracts. You’re not getting a one-size-fits-all solution – you’re getting a product that works in Smith Point’s specific conditions.

A construction worker wearing gloves, knee pads, and boots is crouched down, placing gray paving stones onto gravel at a work site. Dirt and tools are visible in the background.
Most driveways in Smith Point should be seal coated every 2-3 years, depending on traffic and weather exposure. If your driveway faces south and gets heavy sun, or if you park multiple vehicles on it daily, you might need service closer to every 2 years. Driveways with lighter use can often go 3 years between applications. The key is watching for signs that the previous coating is wearing thin – when water stops beading on the surface and starts soaking in, it’s time for a fresh application.
Late spring through early fall gives you the best conditions for seal coating in our area. You need temperatures consistently above 50 degrees and no rain for at least 24 hours after application. We typically recommend scheduling between May and September, with early fall being ideal because the surface has had all summer to expand and settle. Avoid winter and early spring when freeze-thaw cycles are active – the sealcoating won’t cure properly and you’ll end up with a failed application.
Small surface cracks can be filled and then seal coated, but larger cracks need proper repair first. Seal coating isn’t a crack filler – it’s a protective coating that goes over sound asphalt. If you have cracks wider than a quarter-inch or areas where the asphalt is actually breaking apart, those need to be addressed before we apply any sealcoating. We’ll assess your surface and let you know what prep work is needed. Trying to seal coat over significant damage just wastes your money and doesn’t solve the underlying problem.
You can typically walk on seal coated asphalt after 4-6 hours, but you should keep vehicles off for at least 24 hours, and 48 hours is better. The surface might feel dry to the touch before it’s actually cured enough to handle vehicle weight. Temperature and humidity affect drying time – cooler, more humid conditions mean longer cure times. We’ll give you specific guidance based on the weather conditions when we do your job. Rushing back onto a surface that hasn’t fully cured can leave tire marks and damage the coating.
No, seal coating is a thin protective layer, not a patching material. It’s typically only about 1/8 inch thick when applied, so it won’t fill depressions or level uneven areas. If you have potholes or significant low spots, those need to be patched with asphalt before seal coating. Think of seal coating like paint – it protects the surface underneath, but it follows the contours of whatever you’re coating. We can handle minor surface preparation and crack filling, but actual structural repairs are a separate service that should be done first.
It depends on the condition of your asphalt. If the surface is still structurally sound with just surface wear and minor cracking, seal coating can add several years of life and save you from premature replacement. But if your driveway has extensive cracking, crumbling edges, or areas where the base is failing, seal coating won’t fix those problems. We’ll give you an honest assessment of whether seal coating makes sense for your situation or if you’re better off planning for replacement. There’s no point in spending money on a surface that’s beyond help.