Seal Coating in Port Jefferson, NY

Protect Your Asphalt Investment Today

Professional seal coating that extends your driveway’s life and keeps it looking sharp year after year.

A person is applying grey tile adhesive with a notched trowel, laying large rectangular tiles in a staggered pattern. Red spacers are visible between the tiles.

Hear from Our Customers

A construction worker in a gray hoodie and gloves is bending over, placing rectangular paving stones on the ground to build a sidewalk or patio. Tools and construction materials are visible in the background.

Professional Driveway Sealing Services

What Proper Seal Coating Does

Your asphalt faces a beating from Long Island weather. Salt air from the harbor, freeze-thaw cycles, and scorching summer sun all work against your driveway every single day.

Seal coating creates a protective barrier that blocks water penetration and UV damage. Instead of watching your asphalt fade to gray and develop cracks, you get a uniform black finish that looks professionally maintained.

The real value shows up in your wallet. Properly sealed asphalt lasts 3-5 years longer than untreated surfaces. That’s thousands of dollars you won’t spend on premature replacement, plus the peace of mind that comes with a driveway that enhances your property value instead of detracting from it.

Port Jefferson Sealcoating Company

Local Expertise You Can Count On

All Purpose Paving has been protecting Port Jefferson area driveways for years. We understand how coastal conditions affect asphalt differently than inland properties.

Our team uses commercial-grade materials and equipment, not the watered-down products you’ll find at home improvement stores. Every job gets proper surface preparation because shortcuts lead to peeling and premature failure.

When you work with All Purpose Paving, you’re working with contractors who live and work in your community. We stake our local reputation on every driveway we seal.

Stacks of gray concrete paving stones on the ground next to an unfinished pathway, with some pavers already laid in place; yellow sand and soil are visible nearby.

Asphalt Sealing Process

Here's How We Protect Your Driveway

First, your driveway gets thoroughly cleaned. Oil stains, debris, and loose material have to go before any sealer touches the surface. This step separates professional work from amateur applications.

Next comes crack filling if needed. Small cracks get sealed to prevent water infiltration. The goal is creating a uniform surface that accepts the sealer evenly.

The sealer application happens when weather conditions are right. Temperature, humidity, and forecast all matter for proper curing. Two thin coats typically work better than one thick application, ensuring even coverage and optimal protection.

You’ll need to stay off the surface for 24-48 hours depending on conditions. After that, you’ve got a protected driveway that’s ready for whatever Long Island weather brings next.

Three construction workers in work clothes and kneepads stand on a partially completed outdoor stone patio near steps, with tools and a black toolbox nearby. Their upper bodies are mostly out of frame.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Blacktop Sealing Port Jefferson

What's Included in Professional Seal Coating

Every seal coating job starts with complete surface preparation. Your driveway gets power washed, debris removed, and oil stains treated. Proper prep work is what makes the difference between sealer that lasts and sealer that peels off in sheets.

Crack filling comes standard for cracks under a quarter inch. Larger repairs get quoted separately, but most residential driveways just need minor crack sealing to create a smooth, uniform surface.

The sealer itself is commercial-grade material designed for Long Island’s climate. You’re not getting the thin, latex-based products sold at retail stores. This is the same material used on parking lots and commercial properties that need to last.

A construction worker wearing gloves, knee pads, and boots is crouched down, placing gray paving stones onto gravel at a work site. Dirt and tools are visible in the background.
Most driveways in Port Jefferson need seal coating every 2-3 years. The exact timing depends on your driveway’s exposure to sun, traffic levels, and how well it was maintained previously. A driveway that faces south and gets full sun all day will need sealing more frequently than one that’s partially shaded. If you can see aggregate (the small stones in your asphalt) showing through, or if the surface looks gray instead of black, it’s time to seal. Don’t wait until you see significant cracking – seal coating is preventative maintenance, not a repair solution.
Late spring through early fall offers the best conditions for seal coating in Port Jefferson. You need at least 48 hours of dry weather with temperatures between 50-85 degrees for proper curing. Summer can actually be too hot – sealer applied in 90+ degree weather may not cure properly and can become sticky. Early fall is often ideal because temperatures are moderate and humidity is lower. Winter applications don’t work because the sealer won’t cure in cold temperatures, and spring applications can be tricky due to unpredictable weather patterns.
Small cracks (less than 1/4 inch) get filled as part of the seal coating process. These hairline cracks are normal and seal coating actually helps prevent them from expanding. However, larger cracks, alligator cracking, or areas where the asphalt is breaking apart need repair before sealing. Seal coating isn’t a structural repair – it’s a protective coating. If you apply sealer over significant damage, you’re just covering up problems that will continue to worsen underneath. We’ll identify what needs repair versus what can be sealed as-is.
Plan on staying off your sealed driveway for at least 24 hours, but 48 hours is safer, especially in humid conditions or cooler weather. The surface might look dry after a few hours, but the sealer needs time to fully cure underneath. Walking on it too early can leave footprints, and driving on it can cause tire marks or even pull up the sealer. If rain is forecast within 24 hours of application, we’ll reschedule because moisture interferes with proper curing. Temperature and humidity both affect cure time, so we’ll give you specific guidance based on current conditions.
Seal coating costs a fraction of asphalt replacement and can extend your driveway’s life by 3-5 years. A typical driveway seal coating runs a few hundred dollars, while replacement costs thousands. The key is timing – seal coating works as preventative maintenance, not as a fix for severely damaged asphalt. If your driveway is relatively sound but showing signs of aging (fading, minor cracks, surface wear), seal coating is absolutely worth it. However, if you’re dealing with major structural issues, potholes, or extensive cracking, you might be better off investing in repairs or replacement first.
Rain within the first 4-6 hours after seal coating can damage or completely ruin the application. The sealer needs time to form a skin and begin curing before any moisture hits it. Light rain after 8-12 hours usually won’t cause major problems, but heavy rain can still affect the finish quality. This is why we check weather forecasts carefully and won’t start a job if rain is likely within 24 hours. If unexpected rain does hit a fresh seal coat job, we’ll assess the damage and may need to reapply sealer to affected areas once conditions are suitable.