Seal Coating in Brentwood Plaza, NY

Your Asphalt Protected Right the First Time

Professional seal coating that extends your driveway’s life and keeps your property looking sharp year after year.

A person is applying grey tile adhesive with a notched trowel, laying large rectangular tiles in a staggered pattern. Red spacers are visible between the tiles.

Hear from Our Customers

A construction worker in a gray hoodie and gloves is bending over, placing rectangular paving stones on the ground to build a sidewalk or patio. Tools and construction materials are visible in the background.

Professional Asphalt Sealing Services

What Proper Seal Coating Actually Does

Your asphalt isn’t just pavement—it’s a significant investment that takes a beating from Long Island weather. Every winter freeze, summer heat wave, and spring rain works to break down that surface you paid good money for.

Quality seal coating creates a protective barrier that keeps water from seeping into cracks and prevents UV rays from drying out the asphalt binder. You’re looking at 3-5 additional years of life from your driveway or parking lot, which translates to thousands saved on premature replacement.

The difference is immediate too. That fresh, dark appearance doesn’t just look professional—it actually indicates that your asphalt is properly protected from the elements that cause cracking, fading, and eventual failure.

Brentwood Plaza Sealcoating Company

We Know Long Island Asphalt

We’ve been protecting driveways and parking lots across Long Island for years, and we understand exactly what your asphalt faces here in Brentwood Plaza. The freeze-thaw cycles, the salt exposure, the summer heat—we’ve seen how it all affects different surfaces.

We’re not the cheapest option, and that’s intentional. You’re investing in proper surface preparation, commercial-grade sealer, and application techniques that actually work. We use the equipment and materials that ensure your seal coating cures properly and lasts.

When you call us, you’re working with contractors who show up when scheduled, explain what we’re doing, and focus on results that protect your investment for years to come.

Stacks of gray concrete paving stones on the ground next to an unfinished pathway, with some pavers already laid in place; yellow sand and soil are visible nearby.

Driveway Sealing Process

Here's Exactly What We Do

First, we clean your asphalt surface completely—removing debris, oil stains, and loose material that would prevent proper adhesion. This preparation step is where many contractors cut corners, but it’s critical for long-term results.

Next, we fill any cracks with appropriate crack filler and allow proper curing time. Then we apply the sealer using professional equipment that ensures even coverage and proper thickness. We’re not just spraying and hoping—we’re creating a uniform protective layer.

The entire process typically takes one day for most residential driveways, though larger commercial surfaces may require additional time. We’ll keep you informed about timing and when your surface will be ready for traffic again.

Weather matters for seal coating, so we monitor conditions carefully and will reschedule if necessary to ensure proper application and curing. You want this done right, not fast.

Three construction workers in work clothes and kneepads stand on a partially completed outdoor stone patio near steps, with tools and a black toolbox nearby. Their upper bodies are mostly out of frame.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Parking Lot Sealing Services

What's Included in Our Service

Every seal coating job includes thorough surface cleaning, crack filling where needed, and professional application of commercial-grade sealer. We bring the proper equipment to handle everything from residential driveways to large commercial parking lots.

You’ll get realistic expectations about drying time, traffic restrictions, and what your surface will look like both immediately and after full curing. We’re not going to promise miracles, but we will deliver protection that extends your asphalt’s useful life.

For commercial properties in Brentwood Plaza, we understand you need minimal disruption to your business operations. We’ll work with you on timing and can often section off areas to maintain customer access during the process.

The goal isn’t just to make your asphalt look good today—it’s to prevent the water infiltration and oxidation that lead to expensive repairs down the road.

A construction worker wearing gloves, knee pads, and boots is crouched down, placing gray paving stones onto gravel at a work site. Dirt and tools are visible in the background.
Most driveways in our area benefit from seal coating every 2-3 years, depending on traffic and exposure. If your asphalt is newer, you might wait 3-4 years for the first application. The key is timing it before you see significant fading or small cracks developing. Once water starts penetrating the surface regularly, you’re looking at more expensive repairs instead of preventive maintenance. We can assess your specific situation and recommend the right timing based on your driveway’s current condition and age.
Late spring through early fall offers the best conditions, typically May through September. You need temperatures consistently above 50 degrees with no rain in the forecast for at least 24 hours after application. Summer can be ideal, but extremely hot days can cause issues with application and curing. We avoid scheduling during periods of high humidity or when temperatures are expected to drop significantly overnight. The sealer needs proper conditions to cure correctly, and rushing the timeline because of weather usually leads to problems later.
Plan on staying off the surface for at least 24-48 hours, depending on weather conditions. Cool, humid weather extends drying time, while warm, dry conditions allow faster curing. We’ll give you specific guidance based on the forecast and what we observe during application. Walking on the surface is usually fine after 4-6 hours, but vehicle traffic needs to wait longer. Rushing this timeline can leave tire marks or damage the protective coating you just paid for, so patience here saves you from needing touch-ups or reapplication.
Seal coating isn’t designed to fill cracks—it’s a protective coating that goes over properly prepared asphalt. Significant cracks need to be filled with appropriate crack filler before we apply the sealer. Small hairline cracks might be addressed by the sealer, but anything you can fit a coin into needs proper crack filling first. If we try to seal over unfilled cracks, you’ll still have water infiltration and the cracks will likely reappear through the coating. Proper preparation is essential for long-term results.
Residential driveways typically range from $200-600 depending on size and condition, while commercial parking lots are priced per square foot based on total area and complexity. The investment is significantly less than premature resurfacing, which can cost thousands. Factors affecting price include surface preparation needed, crack filling requirements, and accessibility. We provide detailed estimates that break down what’s included so you understand exactly what you’re paying for. The cost of prevention is always less than the cost of replacement.
If rain hits before the sealer has properly cured, it can wash away the coating or prevent proper adhesion, essentially wasting your investment. This is why we monitor weather forecasts carefully and won’t start a job if rain is expected within 24 hours. If unexpected weather occurs during curing, we’ll assess the damage and determine if touch-ups or reapplication are needed. We’d rather reschedule than deliver subpar results. Properly cured seal coating actually helps shed water effectively, but it needs that initial curing time to reach that point.