Oil and Stone Driveway in West Sayville, NY

Get a Durable Driveway for Half the Cost

Professional oil and stone installation that looks great, handles Long Island weather, and costs 50-70% less than traditional asphalt.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get with Oil and Stone

Your driveway becomes a solid, attractive surface that actually grips better in wet weather than smooth asphalt. The natural stone texture gives you excellent traction during those Long Island winters while creating a rustic, upscale appearance that neighbors notice.

You’re not just saving money upfront. Oil and stone driveways flex with ground movement instead of cracking like rigid surfaces. When small repairs are eventually needed, you’re looking at simple patch work, not full replacement sections.

The installation happens fast—usually wrapped up in one to two days depending on size. You can drive on it immediately, which means no lengthy disruption to your daily routine or parking headaches.

West Sayville Driveway Contractors

We Know Long Island Driveways

We at All Purpose Paving have been handling Suffolk County paving projects for years, and we’ve seen what works in this climate. Long Island’s freeze-thaw cycles and coastal moisture create specific challenges that generic contractors often miss.

We focus on oil and stone because it makes sense here. Your soil conditions, your weather patterns, your typical driveway lengths—everything points to this being a smart choice for West Sayville homeowners who want quality without the premium price tag.

You’re working with contractors who live in this area and understand what you’re dealing with. We’ve paved driveways throughout Suffolk County and know how to prep surfaces properly for lasting results.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Chip Seal Driveway Installation Process

Here's How We Install Your Driveway

First, we prepare your existing surface by cleaning and grading it properly. If you have old gravel, we compact and level it. If there’s damaged asphalt, we address any major issues and create a stable base.

Next comes the hot liquid asphalt application. We spread it evenly across the surface at the right temperature and thickness. This isn’t something you can eyeball—temperature and timing matter for proper adhesion.

Then we immediately apply the stone chips while the asphalt is still hot and tacky. The stones get pressed into the surface using specialized equipment, creating that textured finish. We sweep off excess stone and let everything cure.

Within hours, you have a completed driveway that’s ready for traffic. The process moves quickly because we’re not waiting for multiple layers to dry like traditional paving methods.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Stone Driveway Installation Details

What's Included in Your Installation

Your oil and stone driveway installation covers complete surface preparation, hot asphalt application, stone chip embedding, and final cleanup. We handle the grading work needed to ensure proper drainage away from your home.

We source quality stone chips that match West Sayville’s aesthetic while providing the durability you need. The stones aren’t just decorative—they’re sized and graded specifically for this application to create the right texture and longevity.

You get a surface that’s immediately usable without curing time. Unlike concrete or traditional asphalt that requires waiting periods, oil and stone lets you resume normal driveway use right away. We also provide maintenance guidance so you know how to keep your investment looking good for years.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years in Long Island’s climate, sometimes longer with good maintenance. The flexible nature of this surface actually helps it handle our freeze-thaw cycles better than rigid materials like concrete. You might need minor touch-ups after 5-6 years in high-traffic areas, but these are simple repairs that don’t require full resurfacing. The key is proper installation with the right base preparation and stone selection for our local conditions.
Oil and stone typically costs 50-70% less than traditional hot-mix asphalt paving. For a typical West Sayville driveway, you might pay $3,000-4,000 for oil and stone versus $6,000-8,000 for conventional asphalt. The savings become even more significant on longer driveways where traditional paving costs can quickly become prohibitive. You’re getting a durable, attractive surface at a fraction of the cost, which is why many Long Island homeowners choose this option for larger driveways.
When properly installed, stone loss is minimal and mainly occurs in the first few weeks as the surface settles. We embed the stones into hot asphalt under pressure, which locks them in place. You might see a few loose stones initially, especially in turning areas, but this is normal and stops once the surface fully sets. Sweeping up occasional loose stones during the first month is typical. After that, a well-installed oil and stone driveway holds its stones securely for years.
Yes, existing gravel driveways often make excellent bases for oil and stone installation. We evaluate your current gravel for proper depth and stability, then compact and grade it as needed. This can actually save you money since we’re building on an existing foundation rather than starting from scratch. However, the gravel needs to be clean and well-draining. If your gravel has too much fine material or drainage issues, we’ll address those problems first to ensure a lasting installation.
You can drive on your oil and stone driveway immediately after installation is complete. Unlike traditional asphalt that needs curing time, or concrete that requires days to set, oil and stone is ready for normal traffic right away. We recommend avoiding sharp turns and heavy loads for the first day or two while everything settles, but regular car traffic is fine immediately. This quick turnaround is one of the major advantages of choosing oil and stone over other paving options.
Oil and stone driveways are relatively low-maintenance compared to other surfaces. Regular sweeping helps remove debris and keeps the surface looking clean. You might need to add some stone chips in high-wear areas after a few years, which is an easy and inexpensive touch-up. Avoid using snow plows with metal blades that can scrape the surface—rubber-edged plows work fine. A light sealcoat application every 5-7 years can extend the life significantly, but it’s not always necessary depending on traffic and weather exposure.