Oil and Stone Driveway in West Islip, NY

A Durable Driveway That Actually Lasts

Get the strength of asphalt with natural stone beauty at half the cost of full replacement.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Professional Tar and Chip Installation

What You Get With Oil and Stone

Your driveway stops being a problem. No more worrying about cracks spreading or water pooling after every storm. No more getting estimates that make you consider refinancing your house.

Oil and stone gives you a surface that handles West Islip’s weather without the maintenance headaches. The stone creates natural traction when it’s wet, and the oil base flexes with temperature changes instead of cracking like traditional asphalt.

You end up with something that looks intentional – not like a budget compromise. The natural stone texture adds character to your property while solving the practical problems that brought you here in the first place.

West Islip Driveway Contractors

We Know Long Island Driveways

All Purpose Paving has been handling driveway projects across Long Island for years. We’ve seen what works in our climate and what doesn’t.

Most contractors either push expensive full replacements or offer cheap fixes that fail in two years. We focus on oil and stone because it actually solves problems for homeowners in West Islip and surrounding areas.

We use professional-grade equipment and materials, not the shortcuts that give chip seal a bad reputation. Licensed, insured, and straightforward about what you’re getting.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Chip Seal Driveway Process

How We Install Your Stone Driveway

First, we prepare your existing surface. Minor cracks get filled, but we don’t need to tear everything out like a full replacement. That’s where most of your cost savings come from.

Next, we apply a hot oil emulsion across the entire surface. This isn’t regular asphalt – it’s specifically formulated to bond with stone and flex with temperature changes. We spread it evenly using professional-grade equipment.

Then comes the stone application. We use clean, graded stone that’s sized for optimal bonding and drainage. The stone gets embedded into the oil while it’s still tacky, then we compact everything to create a unified surface.

The whole process typically takes 1-2 days depending on your driveway size. You can usually drive on it within 24 hours, though we recommend taking it easy for the first week while everything fully cures.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Long Island Paving Solutions

What's Included in Your Project

Every oil and stone installation includes surface preparation, professional-grade oil emulsion, clean graded stone, and proper compaction. We handle the details that determine whether your driveway lasts 3 years or 15.

We also address drainage issues during preparation. West Islip gets its share of storms, and water sitting on your driveway causes problems regardless of the surface material. Proper grading and drainage integration are part of every job.

You get a detailed estimate upfront with no surprises. We explain what we’re doing and why, so you understand what you’re paying for. The goal is a driveway that handles daily use and Long Island weather without constant maintenance calls.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 8-15 years in Long Island’s climate, depending on traffic and maintenance. The flexibility of the oil base helps it handle our freeze-thaw cycles better than rigid asphalt, which tends to crack. The stone surface also provides excellent drainage, preventing water damage that shortens the life of traditional driveways. With minimal maintenance – mainly keeping it clean and addressing any edge issues early – most homeowners get over a decade of reliable service.
Oil and stone installation typically costs 50-70% less than tearing out your existing driveway and installing new asphalt. The savings come from using your existing base and the simpler installation process. For a typical West Islip driveway, you’re looking at thousands less than full replacement while still getting a professional, durable surface. The exact savings depend on your driveway size and condition, but most homeowners are surprised by how much they can save without compromising quality.
When properly installed, the stone bonds securely with the oil emulsion and stays in place. Some minor loose stone is normal in the first few weeks as everything settles, but it shouldn’t be excessive. The key is using the right stone size, proper oil application, and adequate compaction – which is why professional installation matters. Cheap chip seal jobs that scatter stone everywhere usually cut corners on one of these steps. We use graded stone specifically sized for oil and stone applications and compact everything properly to prevent problems.
You can typically drive on your oil and stone driveway within 24 hours of installation, though we recommend light traffic only for the first week. The surface needs time to fully cure and bond, especially in cooler weather. Avoid sharp turns, heavy vehicles, or parking in the same spot repeatedly during the first week. After that, your driveway can handle normal residential traffic without issues. We’ll give you specific timing based on weather conditions and your particular installation.
Oil and stone actually works better than traditional asphalt for drainage problems because the stone surface allows water to flow through rather than pooling on top. For steep driveways, the stone texture provides excellent traction – much better than smooth asphalt when wet. However, very steep slopes may require additional preparation or drainage solutions to prevent washout. We evaluate each driveway individually and recommend modifications if needed to ensure long-term performance.
Oil and stone driveways are relatively low maintenance compared to traditional asphalt. Keep the surface clean of debris and vegetation, and address any edge deterioration promptly to prevent spreading. Avoid using metal snow plows or shovels that can gouge the surface – plastic or rubber-edged tools work better. Most oil and stone driveways don’t need sealing like asphalt, but a maintenance coat every 8-10 years can extend the life significantly. Overall, you’re looking at much less maintenance than traditional asphalt while getting better performance in wet conditions.