Oil and Stone Driveways in Shirley, NY

Cut Your Driveway Costs in Half

Get the durability you need with the natural stone look you want—without the premium price tag.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Shirley Tar and Chip Installation

What You Get With Oil and Stone

Your driveway becomes a surface that actually improves with time. The oil penetrates and binds the stone, creating a self-sealing layer that handles Long Island’s freeze-thaw cycles without the cracking you see with traditional asphalt.

You get excellent traction year-round. Rain, snow, ice—the textured stone surface grips tires naturally, giving you confidence backing out on winter mornings when smooth surfaces become skating rinks.

The stone stays put. Unlike loose gravel that migrates to your lawn every time you turn the wheel, oil and stone creates a bound surface that looks intentional and stays where you put it. Your property value reflects the upgrade, and your maintenance headaches disappear.

Shirley Stone Driveway Contractors

We Know Long Island Driveways

We’ve been installing oil and stone driveways across Long Island for years, and the Shirley area presents specific challenges that generic contractors miss. The soil composition here, combined with coastal weather patterns, requires techniques that work with local conditions instead of against them.

We focus on proper preparation and material selection that makes sense for this region. When you’re investing in your property, you need contractors who understand why certain approaches fail and others last decades.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Process

Simple Process, Lasting Results

First, the existing surface gets prepared—graded, compacted, and cleared of debris that could cause future problems. This foundation work determines how your driveway performs long-term, so we do it right the first time.

Next comes the oil application. Hot liquid asphalt gets sprayed evenly across the prepared surface, creating the binding agent that holds everything together. Timing matters here—temperature and weather conditions affect how well the oil penetrates and cures.

Finally, selected stone gets spread and rolled into the oil while it’s still tacky. The stone embeds partially, creating texture for traction while the oil binds everything into a cohesive surface. Within 24-48 hours, you have a fully functional driveway that’s ready for regular use.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Installation

What's Included in Your Installation

Every oil and stone installation includes site preparation, proper grading for drainage, and material application using commercial-grade equipment. You get stone selection that matches your property’s aesthetic—from traditional gray to warmer earth tones that complement Long Island’s natural landscape.

The process includes edge work that creates clean lines and prevents stone migration. Proper compaction ensures the surface bonds correctly and performs as intended. You receive guidance on initial curing time and long-term maintenance that keeps your investment looking and performing its best.

Most Shirley installations complete in 1-2 days depending on size and site conditions. The surface is ready for light traffic within hours and full use within 48 hours—much faster than traditional paving methods that require extended curing time.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-12 years in Long Island’s climate, often outlasting traditional asphalt in freeze-thaw conditions. The flexible nature of the oil binder moves with ground shifts without cracking, while the stone surface provides ongoing protection. Regular maintenance like occasional stone touch-ups can extend life even further. The key is proper installation with adequate oil penetration and appropriate stone gradation for local weather patterns.
Oil and stone installation typically costs 50-70% less than traditional asphalt paving, making it an attractive option for larger driveways or budget-conscious homeowners. The savings come from simpler preparation requirements and less expensive materials, but you still get a durable, professional-looking surface. For a typical Shirley driveway, this often means thousands in savings while achieving better traction and a more natural appearance than standard asphalt provides.
Properly installed oil and stone driveways hold their stone firmly in place through the binding action of the oil. Some initial loose stones are normal in the first few weeks as the surface settles, but excessive stone loss indicates installation problems. Quality installation includes proper oil application rates and stone gradation that creates a stable, bound surface. Edge restraints and proper compaction prevent migration, keeping stones where they belong rather than spreading to landscaped areas.
Oil and stone can often be applied over existing asphalt or concrete surfaces if they’re structurally sound, though proper evaluation is essential. The existing surface needs adequate drainage, minimal cracking, and stable edges to serve as a good foundation. Severely damaged or poorly draining surfaces require removal or repair first. This overlay capability can provide additional cost savings while giving old driveways new life with improved appearance and traction characteristics.
Light vehicle traffic is usually acceptable within 4-6 hours after installation, but full curing takes 24-48 hours depending on weather conditions. Hot weather accelerates curing while cool, humid conditions slow the process. During initial curing, avoid sharp turns, heavy vehicles, or parking in one spot for extended periods. Following these guidelines ensures proper bonding and prevents surface damage that could affect long-term performance and appearance.
Oil and stone driveways require minimal maintenance compared to other surfaces. Occasional sweeping removes debris, and periodic stone touch-ups address any areas where stones may have loosened. Every 3-5 years, a light fog seal application can refresh the binder and extend surface life. Snow removal works normally, though metal plow blades should be set slightly higher than on smooth asphalt. Overall maintenance costs remain low while preserving the driveway’s functionality and appearance.