Oil and Stone Driveway in Setauket-East Setauket

Your Driveway Problems End Here

Get the durability you need at half the cost of traditional paving with professional oil and stone installation.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get With Oil and Stone

Your driveway becomes a surface that actually improves with time instead of falling apart. The stone aggregate creates natural traction that keeps you safer in wet conditions – something every Long Island homeowner knows matters during our unpredictable weather.

You’re looking at a solution that costs 50-70% less than full asphalt replacement while delivering better skid resistance and a more attractive natural stone appearance. The oil penetrates and seals your existing surface while the stone layer provides protection and visual appeal.

This isn’t a temporary fix. Oil and stone driveways handle freeze-thaw cycles better than plain asphalt because the stone layer allows for natural expansion and contraction. You get immediate use of your driveway after installation – no waiting days for curing.

Setauket Driveway Contractors

We Know Long Island Driveways

We’ve been handling driveway challenges across Long Island for years. We understand what works in Setauket-East Setauket’s climate and soil conditions.

Local experience matters when you’re dealing with our weather extremes and the specific challenges that come with Long Island’s coastal environment. We’ve seen every type of driveway problem this area throws at homeowners.

Our team knows which preparation methods work best for different soil types and existing surface conditions. This isn’t guesswork – it’s experience applied to your specific situation.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Chip Seal Installation Process

Here's Exactly What Happens

First, your existing driveway gets inspected and prepared. Any major cracks or holes get filled, and the surface is cleaned of debris. This foundation work determines how well your new surface will perform.

Next comes the oil application – a heated asphalt emulsion that penetrates and bonds with your existing surface. The timing here is critical because the stone needs to be applied while the oil is at the right temperature and consistency.

The stone aggregate gets spread evenly across the oil-treated surface, then compacted with specialized equipment. This creates the bond between oil and stone that gives you both durability and traction. Most driveways are ready for light traffic within hours and full use the next day.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Stone Driveway Installation Setauket

What's Included In Your Project

You get complete surface preparation including crack filling and cleaning. The oil application uses quality asphalt emulsion heated to proper temperature for maximum penetration and bonding.

Stone aggregate selection matters for both appearance and performance. Different stone sizes and types work better for different applications. We match the stone to your specific driveway conditions and traffic patterns.

Proper compaction equipment ensures the oil and stone bond correctly. This isn’t something you can achieve with standard rollers – it requires specialized knowledge of pressure, timing, and technique. The final result is a surface that looks professional and performs reliably through Long Island’s weather cycles.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years with minimal maintenance. The longevity depends on your existing surface condition, traffic levels, and weather exposure. In Setauket-East Setauket’s climate, you can expect excellent performance because the stone layer protects the oil from UV damage and allows for natural expansion during freeze-thaw cycles. Many homeowners find their oil and stone surface outlasts traditional asphalt in our coastal environment.
Yes, in most cases oil and stone can be applied directly over existing asphalt or concrete surfaces. Your existing driveway needs to be structurally sound – minor cracks and surface wear are actually ideal conditions for this application. The oil penetrates into small cracks and bonds with the existing surface while the stone provides a new protective layer. Severely damaged surfaces with major settling or large holes may need additional preparation, but this is still typically less expensive than complete replacement.
Oil and stone uses heated asphalt emulsion with stone aggregate on top, while regular asphalt mixes the aggregate throughout the material. This gives oil and stone better traction and a more natural appearance. The installation process is faster because there’s no need for heavy equipment to lay thick asphalt layers. Oil and stone also handles temperature changes better because the stone layer allows for natural movement, reducing cracking. The cost difference is significant – typically 50-70% less than new asphalt installation.
You can typically drive on your oil and stone driveway within 24 hours of installation, though light foot traffic is usually fine within a few hours. The exact timing depends on weather conditions and temperature. Hot weather speeds curing while cool, humid conditions may require additional time. This is much faster than traditional asphalt which often requires several days before full use. We provide specific timing based on your installation conditions and local weather forecast.
Some loose stones are normal for the first few weeks as the surface settles and excess aggregate works free. Proper installation minimizes this by using the right stone size and ensuring adequate compaction. Most loose stones appear at the edges or in areas with the heaviest turning traffic. Sweeping these loose stones back onto the surface actually helps fill any small gaps. After the initial settling period, a well-installed oil and stone surface should have minimal loose aggregate.
Oil and stone driveways require very little maintenance compared to traditional asphalt. Occasional sweeping to redistribute any loose stones and basic crack sealing if needed after several years. You don’t need regular sealcoating like asphalt driveways because the stone layer provides natural protection. Snow removal is actually easier because the textured surface provides better traction for both vehicles and snow removal equipment. Most homeowners find the maintenance requirements significantly lower than their previous asphalt surfaces.