Oil and Stone Driveway in Ronkonkoma, NY

Durable Stone Driveways That Actually Last

Get the rustic beauty of stone with proven durability for half the cost of traditional paving.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get With Oil and Stone

Your driveway becomes a surface that handles everything Long Island weather throws at it. No more dealing with cracks every spring or worrying about winter damage.

The oil and stone process creates a flexible surface that moves with ground shifts instead of breaking apart. You get excellent traction in wet conditions and natural drainage that prevents ice buildup. The stone texture looks attractive year-round and actually improves with age.

Most importantly, you’re not stuck with expensive repairs every few years. Oil and stone driveways need simple resealing every 3-5 years, and that’s it. No patching, no major repairs, no headaches.

Ronkonkoma Driveway Contractors

We Know Long Island Driveways

We’ve been installing oil and stone driveways throughout Suffolk County for years. We understand how Long Island’s freeze-thaw cycles, salt exposure, and heavy rains affect different driveway materials.

We’re not the cheapest option, and that’s intentional. You’re getting contractors who know the difference between a quick job and one that lasts. We use quality materials, proper preparation, and techniques that work specifically for our local climate.

When you call us, you’re working with people who live here, understand the local challenges, and have seen what works and what doesn’t in Ronkonkoma driveways.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Chip Seal Driveway Installation Process

Here's How We Install Your Driveway

First, we prepare your existing surface by cleaning and making necessary repairs. If you have an old asphalt driveway, we can often use it as a solid base, which saves you money on excavation.

Next, we apply a layer of hot liquid asphalt evenly across the surface. While it’s still hot, we spread a layer of carefully graded stone chips and roll everything together. The stone embeds into the asphalt, creating a textured, durable surface.

The final step is sweeping away loose stones and allowing the surface to cure. You can typically drive on your new oil and stone driveway within 24 hours. The whole process usually takes 1-2 days depending on the size of your driveway.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Stone Driveway Installation Ronkonkoma

What's Included in Your Installation

Your oil and stone driveway installation includes complete surface preparation, quality liquid asphalt application, and professionally graded stone chips. We handle all the details from start to finish.

We source our materials from local suppliers who understand Long Island’s climate requirements. The stone chips we use are sized specifically for durability and appearance. Our liquid asphalt is formulated to handle temperature extremes without becoming brittle or soft.

You also get our knowledge of local conditions. We know how to grade for proper drainage, which base preparations work best in Ronkonkoma soil, and how to create edges that won’t deteriorate over time. This isn’t just about laying materials – it’s about building a driveway that works for your specific property and our local weather patterns.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-12 years in Long Island’s climate before needing major renewal. The surface is designed to handle our freeze-thaw cycles better than traditional asphalt because it’s more flexible. You’ll need to reseal it every 3-5 years, which is a simple process that extends the life significantly. The key is proper installation and using materials suited for our local weather conditions, which is why working with experienced Long Island contractors matters.
Oil and stone (also called tar and chip) uses liquid asphalt with stone chips embedded in the surface, while regular asphalt is a mixed and rolled material. The stone chips give you better traction, especially when wet, and create a more attractive textured appearance. Oil and stone is also more flexible, so it handles ground movement better without cracking. The installation process is different too – oil and stone can often be applied over existing surfaces, while asphalt typically requires complete removal and replacement.
Oil and stone driveways typically cost 30-50% less than complete asphalt replacement. The exact savings depend on your current driveway condition and size, but most Ronkonkoma homeowners save several thousand dollars. The cost advantage comes from being able to use existing surfaces as a base in many cases, plus the simpler installation process. You’re getting a durable, attractive surface for significantly less money than traditional paving options, which is why it’s become popular with Long Island homeowners.
In most cases, yes, if the existing asphalt provides a stable base. We evaluate the current condition and make necessary repairs before installation. Minor cracks and surface wear aren’t usually problems, but we need to address any major structural issues first. This is actually one of the biggest advantages of oil and stone – you often don’t need expensive excavation and complete removal. We can work with what you have, make it structurally sound, and give you a completely new surface that looks and performs better than what you had.
You can typically drive on your new oil and stone driveway within 24 hours of installation, weather permitting. This is much faster than concrete, which needs weeks to cure, and even faster than some asphalt applications. We recommend light traffic only for the first few days and avoiding sharp turns or heavy vehicles initially. The surface continues to set and improve over the first few weeks, but you don’t have to arrange alternative parking or worry about long curing times like with other driveway materials.
Oil and stone driveways are relatively low maintenance compared to other surfaces. The main maintenance is resealing every 3-5 years, which involves applying a fresh coat of liquid asphalt to refresh the surface. You might need to add stone chips in high-traffic areas occasionally. Regular sweeping helps maintain appearance, and prompt attention to any edge deterioration prevents bigger problems. Unlike asphalt that needs crack filling and patching, oil and stone maintenance is more predictable and less expensive. The flexible nature of the surface means fewer surprise repairs.