Oil and Stone Driveway in Pine Air, NY

Get More Driveway for Less Money

Oil and stone driveways cost 60% less than asphalt while lasting just as long in Pine Air’s challenging weather.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Actually Get Here

Your driveway handles Pine Air winters without the cracking and heaving that destroys traditional asphalt. Water drains through the stone surface instead of pooling and freezing into dangerous ice patches.

You get a surface that looks like expensive stone but costs a fraction of the price. The textured finish provides better traction when wet, and the flexible oil base moves with ground shifts instead of cracking apart.

Most homeowners see 15-20 years from a properly installed oil and stone driveway. That’s the same lifespan as asphalt at less than half the cost, especially on longer driveways where the savings really add up.

Pine Air Driveway Contractors

We Know Pine Air Driveways

We’ve been installing oil and stone driveways across Long Island for over two decades. We understand Pine Air’s soil conditions, drainage challenges, and how the freeze-thaw cycles affect different driveway materials.

Most contractors around here push asphalt because it’s what they know. We specialize in chip seal and tar and chip installations because we’ve seen how well they perform in our climate. Your neighbors in Babylon, West Islip, and Bay Shore have trusted us with their driveways, and the results speak for themselves.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's Exactly What Happens

We start by preparing your existing driveway base or creating a new one with proper grading for drainage. The key is getting the slope right so water moves away from your foundation instead of pooling.

Next comes the hot oil application – this isn’t regular asphalt but a specialized emulsion that stays flexible. We spread it evenly across the surface, then immediately apply your chosen stone chips while the oil is still tacky.

The final step involves rolling everything to embed the stones properly and sweeping off any loose material. Most driveways are ready for light traffic within 24 hours, though we recommend waiting 48 hours before parking heavy vehicles. The whole process typically takes one to two days depending on your driveway size.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Stone Driveway Installation Details

What's Included in Your Project

Every oil and stone driveway installation includes proper base preparation, premium-grade oil emulsion, and your choice of stone colors and sizes. We handle all the prep work, including minor grading adjustments and edge work to contain the materials.

You get a written warranty covering workmanship and material adhesion. We also include one follow-up visit after 30 days to address any loose stones or minor touch-ups – this is normal with chip seal driveways and part of the process.

Pine Air’s sandy soil actually works in your favor with oil and stone installation. The natural drainage helps prevent the base movement that can cause problems with rigid surfaces like concrete. We’ve learned which stone sizes work best in different areas of Long Island, and we’ll recommend the right combination for your specific location and traffic patterns.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 15-20 years in Pine Air’s climate. The flexible oil base handles our freeze-thaw cycles better than rigid concrete, while the stone surface resists wear from traffic and weather. The key factors affecting lifespan are proper installation, adequate drainage, and occasional maintenance like adding loose stones in high-traffic areas. Most homeowners find they need minor touch-ups every 5-7 years rather than complete replacement.
Oil and stone, tar and chip, and chip seal are essentially the same process with different names used in different regions. All involve applying a liquid binder (oil emulsion or tar) followed by stone chips that are rolled into the surface. The modern process uses oil emulsion rather than actual tar, which is more environmentally friendly and provides better adhesion. In Pine Air, most contractors use the terms interchangeably, but the installation process and end result are identical.
Oil and stone typically costs 40-60% less than traditional asphalt installation, with the biggest savings on longer driveways. For a typical Pine Air driveway of 1,000 square feet, you might pay $3,000-4,000 for oil and stone versus $6,000-8,000 for asphalt. The exact savings depend on current material costs, driveway length, and site conditions. Since both surfaces last about the same time, the cost per year heavily favors oil and stone, especially when you factor in asphalt’s higher maintenance requirements.
Some loose stones are normal for the first few weeks after installation as the surface settles and traffic patterns develop. Most loose stones appear at the edges or in turning areas where tires create more stress. We include a 30-day follow-up to sweep any excess stones and add material where needed. After the initial settling period, a well-installed oil and stone driveway should have minimal loose stones. Proper rolling during installation and choosing the right stone size for your traffic patterns minimizes this issue.
Oil and stone installation requires dry conditions and temperatures above 50°F for proper adhesion. We can’t install during rain or when rain is expected within 24 hours of completion. In Pine Air, the best installation window is typically late spring through early fall. Winter installations are possible during warm spells, but we prefer to schedule major projects when weather conditions are more predictable. We’ll work with you to find the right timing based on your needs and Long Island’s weather patterns.
Oil and stone driveways require minimal maintenance compared to asphalt. Sweep loose debris regularly and avoid using snow plows with metal blades that can scrape the surface. Small areas of stone loss can be patched easily with matching materials. Every 7-10 years, you might want to apply a fog seal (thin oil coating) to refresh the binder and extend the surface life. Unlike asphalt, you don’t need to seal coat every few years. Most maintenance involves keeping drainage areas clear and addressing any edge erosion before it becomes a bigger problem.