Oil and Stone Driveway in Mastic Beach, NY

Get a Durable Driveway Without Breaking the Budget

Professional oil and stone installation that gives you years of reliable performance at a fraction of traditional costs.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get With Oil and Stone

Your driveway becomes a surface that actually handles what Long Island throws at it. Rain runs off instead of pooling. Snow and ice don’t create the same slippery mess you’re used to.

The natural stone texture gives you better traction year-round. You’re not dealing with the cracking and crumbling that comes with standard asphalt after a few harsh winters.

And here’s what really matters – you get this durability without paying for a complete driveway replacement. Oil and stone, also called tar and chip, goes right over your existing surface in most cases. That means less disruption, less cost, and a finished driveway that looks like you spent twice what you actually did.

Mastic Beach Driveway Contractors

We Know Long Island Driveways

We’ve been handling driveway projects across Long Island for years. We’ve seen what works here and what doesn’t.

The coastal climate in Mastic Beach creates specific challenges. Salt air, freeze-thaw cycles, and heavy summer storms all take their toll on driveways. We use techniques and materials that account for these conditions.

You’re working with contractors who understand local requirements, have proper licensing, and show up when we say we will. Our work speaks for itself throughout Suffolk County.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's How We Install Your Surface

First, we prepare your existing driveway by cleaning and making any necessary repairs. Minor cracks and surface issues get addressed before we start the oil and stone application.

Next comes the hot liquid asphalt application. This gets spread evenly across the surface at the right temperature and thickness. Timing matters here – the asphalt needs to be at the perfect consistency for the stone to bond properly.

Then we apply the stone aggregate while the asphalt is still tacky. The stone gets rolled into the surface, creating that durable, textured finish. After the initial rolling, we sweep off excess stone and let everything cure. Most driveways are ready for light traffic within 24 hours.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Features

What's Included in Your Installation

Your oil and stone driveway includes proper surface preparation, quality liquid asphalt, and your choice of stone aggregate size and color. We handle the cleanup and make sure your property looks better than when we arrived.

The stone we use is specifically graded for driveway applications. Too large and it doesn’t bond well. Too small and you lose the texture benefits. We stock the right materials for Long Island conditions.

You also get our knowledge of local requirements and proper installation techniques. Many contractors skip steps or use shortcuts that cause problems later. We do the job right the first time because that’s what builds our reputation in communities like Mastic Beach.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 10-15 years with basic maintenance. The longevity depends on factors like traffic volume, weather exposure, and how well the surface was prepared initially. In Long Island’s climate, you can expect excellent performance for at least a decade. The key is starting with proper installation and addressing any minor maintenance needs promptly. Most homeowners find that oil and stone outlasts their expectations, especially compared to the deteriorating asphalt they replaced.
Yes, in most cases oil and stone can be applied directly over your existing asphalt driveway. This is one of the major cost advantages – you’re not paying for complete removal and replacement. However, the existing surface needs to be structurally sound. Major potholes, severe cracking, or areas where the base has failed will need repair first. We evaluate your current driveway during the estimate process and let you know what preparation work is needed. Minor surface cracks and wear are actually normal and don’t prevent a successful oil and stone application.
Oil and stone, also called tar and chip or chip seal, uses liquid asphalt with stone aggregate on top, while regular asphalt mixes the stone into the asphalt before installation. This gives oil and stone better texture and traction, plus it’s more cost-effective. The stone surface also reflects heat better than solid asphalt, so it stays cooler in summer. Installation is faster since we’re not dealing with heavy asphalt trucks and rollers. The trade-off is that oil and stone has a more rustic, textured appearance compared to the smooth finish of traditional asphalt.
Oil and stone typically costs 40-60% less than complete asphalt replacement. The exact savings depend on your driveway size, current condition, and local material costs. You’re saving money on excavation, base preparation, and the large quantities of asphalt needed for traditional installation. Plus, if your existing driveway base is solid, you’re not paying to redo work that’s still functional. We provide detailed estimates that break down all costs, so you can see exactly where the savings come from compared to full replacement options.
The ideal installation window is late spring through early fall when temperatures are consistently above 50 degrees. The liquid asphalt needs warm weather to properly bond with the stone aggregate. We typically schedule most oil and stone projects between May and October on Long Island. Weather conditions on installation day matter too – we avoid rainy or extremely humid days that can affect the curing process. If you’re planning an oil and stone driveway, contacting us in early spring gives you the best selection of installation dates during prime weather.
Oil and stone performs very well in Long Island’s coastal climate. The textured surface provides excellent traction during winter weather, and the stone aggregate handles freeze-thaw cycles better than smooth asphalt surfaces. Salt air doesn’t affect the stone component, and the natural drainage properties help prevent water damage. Many of our Long Island installations are 15+ years old and still performing well. The key is using the right grade of liquid asphalt and stone aggregate for local conditions, which we’ve refined through years of experience in Suffolk County.