Oil and Stone Driveway in Heer Park, NY

Get a Beautiful, Affordable Driveway Solution

Professional oil and stone installation that costs less than asphalt while delivering superior drainage and lasting durability.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get with Oil and Stone

Your driveway becomes a functional, attractive surface that handles Long Island weather without the premium price tag of traditional asphalt. Water drains naturally through the stone surface instead of pooling and creating ice hazards during winter months.

You’ll have a driveway that looks intentionally rustic and blends naturally with your landscape. The textured surface provides excellent traction for vehicles and foot traffic, even when wet.

Most importantly, you’re investing in a solution that typically costs 40-60% less than conventional asphalt while still giving you 7-10 years of reliable service. The oil and stone process creates a flexible surface that adapts to ground movement, reducing the cracking issues common with rigid paving materials.

Heer Park Driveway Contractors

We Know Long Island Driveways

We’ve been installing oil and stone driveways throughout Long Island for years, and we understand what works in this climate. We’ve seen how traditional asphalt fails during freeze-thaw cycles and how poor drainage creates ongoing problems for homeowners.

Our team handles everything from residential driveways to larger commercial projects. We use proper equipment and quality materials because we know the difference it makes in the final result.

We’re based locally, which means we’re available for follow-up service and we understand the soil conditions and weather patterns that affect driveway performance in Heer Park and surrounding areas.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's How We Install Your Driveway

First, we prepare your base by grading and compacting the surface. If you have an existing asphalt driveway in decent condition, we can often apply the oil and stone directly over it, saving you the cost of complete removal.

Next, we apply a layer of hot liquid asphalt using specialized equipment. This creates the binding agent that will hold your stone surface together. We immediately follow with a layer of clean, graded stone that’s rolled into the asphalt while it’s still tacky.

The final step involves applying a second layer of smaller stone chips and rolling everything smooth. This creates the finished surface texture and locks everything in place. Most driveways are ready for light traffic within 24 hours, though we recommend waiting a few days before heavy use.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Installation

What's Included in Your Installation

Your oil and stone driveway installation includes proper base preparation, quality liquid asphalt application, and two layers of graded stone. We handle all the grading work to ensure proper drainage away from your home and garage.

We bring professional-grade equipment including heated asphalt distributors and pneumatic rollers. This isn’t a DIY-quality job – we use the same methods and materials that road crews use for chip seal applications on public roads.

You’ll also get guidance on proper maintenance to maximize your driveway’s lifespan. Oil and stone surfaces benefit from occasional stone reapplication in high-traffic areas, and we can show you what to watch for and when to call us for touch-ups.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years with basic maintenance. The lifespan depends on traffic volume, weather exposure, and how well the base was prepared. Heavy traffic areas like the approach to your garage may need stone reapplication after 5-6 years, but this is a simple and inexpensive process. The key is starting with proper base preparation and using quality materials during installation.
Yes, oil and stone installation typically costs 40-60% less than traditional asphalt paving. The material costs are lower and the installation process is faster, which reduces labor expenses. However, the long-term value depends on your priorities – asphalt may last longer but requires a much higher upfront investment. Oil and stone gives you a functional, attractive driveway at a fraction of the cost, making it an excellent choice for budget-conscious homeowners.
Some loose stone is normal during the first few weeks after installation as the surface settles and traffic patterns develop. We apply extra stone during installation to account for this. After the initial settling period, a properly installed oil and stone driveway should have minimal stone loss. If you notice significant loose stone after the first month, it may indicate an issue with the installation that should be addressed.
In many cases, yes. If your existing asphalt driveway has a solid base without major structural problems, we can apply oil and stone directly over it. This saves you the cost of removal and disposal. However, if the existing surface has significant cracking, settling, or drainage issues, we may need to address those problems first. We’ll evaluate your current driveway and recommend the best approach during our initial assessment.
Oil and stone driveways require minimal maintenance compared to other paving options. Avoid using snow plows or metal shovels that can scrape away stone. Instead, use plastic shovels or snow blowers for winter maintenance. Occasionally, you may need to add loose stone to high-traffic areas or areas where stones have shifted. We can provide touch-up stone and show you how to apply it, or handle the maintenance for you.
Oil and stone, tar and chip, and chip seal are different names for essentially the same process. The technique involves applying liquid asphalt and immediately covering it with graded stone. Some contractors may use slightly different stone sizes or application methods, but the basic concept is identical. The terminology often depends on regional preferences – chip seal is more common in western states, while oil and stone or tar and chip are more frequently used here in the Northeast.