Oil and Stone Driveway in Hampton Bays

Get a Durable Driveway That Actually Lasts

Cost-effective oil and stone installation that handles Hampton Bays weather without the premium price tag.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Professional Tar and Chip Installation

What You Get With Oil and Stone

Your driveway becomes a solid, weather-resistant surface that drains properly and looks good year after year. No more worrying about cracks spreading across the entire surface or dealing with expensive full replacements every few years.

Oil and stone driveways give you the durability you need without the maintenance headaches. The stone surface provides natural traction even when wet, and individual sections can be repaired easily if damage occurs.

You’ll have a driveway that complements your Hampton Bays property while handling everything from summer heat to winter freeze-thaw cycles. The natural stone finish works with most home styles and doesn’t show wear patterns like smooth asphalt surfaces do.

Hampton Bays Driveway Contractors

We Know Long Island Driveways

We’ve been installing oil and stone driveways throughout Long Island for years. We understand the specific challenges that Hampton Bays properties face, from sandy soil conditions to salt air exposure.

Our team knows how to properly prepare surfaces and apply materials so your driveway performs well in coastal conditions. We’ve worked on everything from seasonal homes to year-round residences, always focusing on installations that last.

When you work with us, you’re getting contractors who live and work in this area. We understand local conditions and use techniques that work specifically for Long Island properties.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's How We Install Your Driveway

First, we prepare your existing surface or create a proper base if you’re starting from scratch. This foundation work is critical for long-term performance, especially with the soil conditions we see in Hampton Bays.

Next, we apply a hot liquid asphalt binder evenly across the surface. While this binder is still tacky, we spread and roll clean stone chips into it. The stone becomes embedded in the binder, creating a textured, durable surface.

Finally, we remove any loose stone and ensure proper drainage around the edges. The entire process typically takes one to two days depending on your driveway size, and you can usually drive on it within 24 hours. We’ll walk you through exactly what to expect before we start.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Benefits

What Makes Oil and Stone Different

Oil and stone driveways cost significantly less than traditional asphalt while offering comparable durability. The stone surface provides better traction and drainage than smooth asphalt, which matters during Long Island winters.

This type of surface works particularly well for Hampton Bays properties because it handles the freeze-thaw cycles we get here. Instead of large cracks that require full section replacement, any damage typically affects small areas that can be patched easily.

The natural stone appearance fits well with both traditional and contemporary Long Island home styles. You get a functional driveway that looks intentional, not like a budget compromise. The textured surface also hides normal wear better than smooth surfaces do.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years in Hampton Bays conditions, sometimes longer with basic maintenance. The coastal climate here actually works in favor of this surface type because the stone provides excellent drainage and the flexible binder handles temperature changes well. Unlike rigid concrete that can crack from ground movement, or smooth asphalt that develops surface issues, oil and stone surfaces age gradually and can be maintained section by section as needed.
Oil and stone, tar and chip, and chip seal are all names for essentially the same process – applying liquid asphalt binder with stone chips rolled into the surface. The terminology varies by region, but the installation method and results are the same. Some contractors might use slightly different stone sizes or binder formulations, but you’re getting the same type of durable, textured surface regardless of what it’s called. What matters most is proper installation technique and quality materials.
In many cases, yes, we can apply oil and stone over existing asphalt or concrete surfaces, which saves you money on removal and disposal costs. The existing surface needs to be structurally sound and properly prepared first. We’ll evaluate your current driveway’s condition, make any necessary repairs, and ensure proper drainage before installation. If your existing surface has major structural problems or drainage issues, we’ll recommend addressing those first to ensure your new oil and stone surface performs properly.
Oil and stone driveways typically cost 30-50% less than traditional hot-mix asphalt installation. The exact savings depend on your driveway size, current surface condition, and site preparation requirements. You’re getting a durable surface at a fraction of the cost because the installation process is more straightforward and uses less material. When you factor in the longevity and easy repair options, oil and stone often provides better long-term value than more expensive alternatives.
Some loose stone is normal for the first few weeks after installation as the surface settles and excess material works free. We remove most loose stone before you start using the driveway, but light traffic will naturally sweep away any remaining loose chips. After this initial period, properly embedded stones stay in place for years. The key is proper installation technique – ensuring the binder is at the right temperature and the stones are adequately rolled into the surface during installation.
Oil and stone driveways require minimal maintenance compared to other surface types. Occasional sweeping removes debris, and you might need to add stone chips to high-traffic areas every few years. Small damaged sections can be patched easily without redoing the entire surface. The main thing is keeping drainage areas clear so water doesn’t pool on the surface. Unlike asphalt that needs regular sealcoating, or concrete that requires joint maintenance, oil and stone surfaces maintain themselves naturally through normal use.