Oil and Stone Driveway in Fort Salonga, NY

Beautiful Driveways Without the Premium Price

Get the durability you need and the look you want for 50% less than traditional asphalt.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Affordable Driveway Solutions Fort Salonga

What You Get With Oil and Stone

Your driveway becomes a surface that actually handles Long Island weather better than asphalt. The stone chips create natural traction that keeps you safe during wet conditions, while the oil base flexes with temperature changes instead of cracking.

You’re looking at a driveway that costs significantly less upfront and requires minimal maintenance over the years. No seal coating every few years like asphalt demands.

The natural stone appearance gives you curb appeal that looks intentional and attractive, not like you chose the budget option. Most neighbors assume it cost more than it did.

Long Island Paving Contractors

We Know Fort Salonga Driveways

We’ve been installing oil and stone driveways across Long Island for years. We understand the soil conditions here, the weather patterns, and what works long-term in this area.

We’re not the guys who disappear after the job. You’ll find us here next year and the year after that, because this is our community too.

Our crews know the difference between a quick job and a job done right. That means proper base preparation, quality materials, and installation timing that works with the weather, not against it.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's Exactly What Happens

First, we prepare your base properly. This means grading, compacting, and making sure drainage works correctly. Skip this step and you’ll have problems later, regardless of the surface material.

Next comes the hot oil application, followed immediately by the stone chips. We use a specific grade of stone that bonds well and provides the right texture. The timing here matters – everything has to happen while the oil is at the right temperature.

Finally, we compact everything and clean up the edges. The surface is ready for light traffic almost immediately, but we’ll give you specific timing for full use based on weather conditions.

The whole process typically takes 1-2 days for most residential driveways, depending on size and access.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Tar and Chip Driveway Benefits

Why Oil and Stone Works Here

Fort Salonga’s climate actually favors oil and stone over traditional asphalt. The freeze-thaw cycles that crack asphalt don’t affect oil and stone the same way because the surface flexes rather than becoming rigid.

You’re also getting a surface that handles the occasional coastal storm better. The stone chips don’t wash away like loose gravel, and the oil base doesn’t deteriorate from salt exposure as quickly as asphalt.

The cost advantage becomes even more significant on longer driveways. While asphalt costs climb dramatically with square footage, oil and stone remains affordable even for larger areas.

Most homeowners find the natural appearance actually improves over time as the stones settle and weather slightly, creating a more established look rather than the fresh-from-the-factory appearance that fades with other materials.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years before needing significant attention, and often longer with minimal maintenance. The longevity depends heavily on the base preparation and the quality of materials used. Unlike asphalt that can crack and require patching, oil and stone tends to wear more gradually and evenly. When it does need refreshing, you’re usually looking at a surface treatment rather than complete replacement, which keeps long-term costs manageable.
Oil and stone actually performs well on moderate slopes because the stone chips provide excellent traction. However, very steep driveways (over 15% grade) can present challenges during installation and may experience some stone migration over time. We evaluate each driveway individually and can recommend modifications like cross-slope drainage or alternative stone grades for steeper applications. In many cases where asphalt would be slippery when wet, oil and stone provides better grip and safety.
Maintenance is minimal compared to asphalt. You’ll want to occasionally sweep or blow off leaves and debris, and you might need to add a few stone chips in high-traffic areas after several years. There’s no seal coating required like with asphalt. The main thing to watch for is edge maintenance – keeping the borders clean and defined. Most homeowners find they can handle routine maintenance themselves. After 5-7 years, you might choose to apply a light oil treatment to refresh the appearance, but it’s not always necessary.
Oil and stone typically costs 50-70% less than asphalt installation, with the savings becoming more significant on larger driveways. A 1000 square foot driveway that might cost $4000-6000 in asphalt could be $2000-3000 in oil and stone, depending on site conditions and material choices. The long-term costs also favor oil and stone because you’re not paying for seal coating every few years. When you factor in the total cost of ownership over 10 years, oil and stone often comes out significantly ahead.
In many cases, yes, if the existing asphalt is in decent structural condition without major cracks or settling issues. The asphalt needs to be clean and stable, and we may need to address any significant cracks or holes first. Applying oil and stone over sound asphalt can actually extend the life of your driveway while giving you a fresh appearance at a fraction of the cost of asphalt replacement. We evaluate each situation individually because the condition of the existing surface determines whether this approach will be successful long-term.
Late spring through early fall provides the best conditions for oil and stone installation. We need temperatures consistently above 50 degrees and dry conditions for proper adhesion. Summer installation is ideal, but we can work in shoulder seasons if weather cooperates. Winter installation isn’t recommended because the oil doesn’t penetrate and bond properly in cold conditions. We typically schedule Fort Salonga installations between April and October, with July and August being the most predictable months for weather conditions that ensure quality results.