Oil and Stone Driveway in East Yaphank

Get a Durable Driveway for Half the Cost

Professional oil and stone installation that handles Long Island weather while saving you thousands over traditional asphalt.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

East Yaphank Tar and Chip Driveways

What You Get with Oil and Stone

Your driveway stops being a constant worry. No more watching cracks spread every winter or dealing with water pooling after storms.

Oil and stone creates a flexible surface that moves with the ground instead of fighting it. When Long Island’s freeze-thaw cycles hit, your driveway adapts rather than cracks. The stone provides natural drainage, so water flows through instead of sitting on top creating ice patches.

You get the look of a high-end stone driveway without the premium price. The natural texture and color variations give you curb appeal that actually improves over time as the stones settle into place. Most homeowners in East Yaphank are surprised how much more attractive their property looks compared to plain black asphalt.

Long Island Paving Contractors

We Know Long Island Driveways

All Purpose Paving has been installing oil and stone driveways across Suffolk County for years. We understand how Long Island’s clay soil, winter weather, and coastal humidity affect different paving materials.

Our team has seen what works and what fails in East Yaphank specifically. We know which stone grades handle the area’s traffic patterns and how to prep surfaces for Long Island’s ground movement. Most importantly, we show up when scheduled and complete jobs properly the first time.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil and Stone Installation Process

Here's How Your Project Works

First, the existing surface gets cleaned and prepped. Any major cracks or holes are filled, and the area is graded for proper drainage. This foundation work determines how well your driveway performs long-term.

Next, a layer of liquid asphalt is applied evenly across the surface. While it’s still tacky, clean stone chips are spread and rolled into the oil. The stones embed partially, creating a textured surface that’s both durable and attractive.

The final step involves removing loose stones and allowing the surface to cure. You can typically drive on your new oil and stone driveway within 24-48 hours, depending on weather conditions. The surface continues to improve as traffic helps seat the stones properly.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Services

What's Included in Your Installation

Every oil and stone project includes proper surface preparation, which many contractors skip to save time. All Purpose Paving cleans the existing surface, fills significant cracks, and ensures proper grading for water runoff.

We use quality liquid asphalt and clean stone chips sized specifically for driveway applications. Cheaper contractors often use whatever stone is available, but proper chip size affects both appearance and durability. The right materials cost more upfront but save money over time.

You also get cleanup and disposal of old materials when needed. Many East Yaphank homeowners are surprised how much debris gets generated during prep work. We handle removal so you don’t deal with piles of old asphalt or broken concrete in your yard.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7-10 years in Long Island conditions, sometimes longer with good maintenance. The lifespan depends on traffic volume, weather exposure, and how well the base was prepared. Unlike asphalt that cracks and needs complete replacement, oil and stone can be spot-repaired or have a fresh seal coat applied to extend its life. Many East Yaphank homeowners find they get excellent value compared to other paving options that cost twice as much upfront.
Yes, oil and stone actually handles Long Island winters better than solid asphalt in many ways. The flexible surface moves with freeze-thaw cycles instead of cracking, and the stone texture provides excellent traction on snow and ice. Water drains through the surface rather than pooling and freezing on top. However, you should avoid using metal snow plows directly on the surface – use rubber-edged plows or snow blowers instead. Salt and sand can be applied normally for winter maintenance.
Oil and stone typically costs 40-60% less than new asphalt installation in the East Yaphank area. For an average driveway, you might pay $3,000-4,000 for oil and stone versus $6,000-8,000 for quality asphalt. The exact cost depends on your driveway size, current condition, and prep work needed. While oil and stone may need resealing sooner than asphalt, the lower upfront cost and easy repairs often make it more economical over time, especially for homeowners on a budget.
In many cases, yes – oil and stone can be applied over existing asphalt or concrete that’s in decent structural condition. The surface needs to be stable without major settling or large cracks, but minor surface damage isn’t usually a problem. This overlay application saves money on demolition and disposal costs. However, if your existing driveway has significant base problems or drainage issues, those need to be addressed first. A proper evaluation determines whether overlay is suitable for your specific situation.
Some loose stones are normal for the first few weeks after installation as the surface settles and excess material works free. Most of this happens within the first month, and regular sweeping keeps things tidy. After the initial settling period, a properly installed oil and stone driveway shouldn’t generate significant loose stones. If you continue having problems with stones coming loose after several months, it usually indicates installation issues with either the oil application rate or stone embedding process.
Maintenance is straightforward – sweep loose stones occasionally, especially in the first month after installation. Avoid using metal snow plows or sharp tools that can gouge the surface. Small damaged areas can be patched with new oil and stone rather than replacing entire sections. Every 5-7 years, you might want to apply a fresh seal coat to refresh the surface and extend its life. Keep vegetation from growing along edges, and ensure proper drainage continues to flow away from the driveway to prevent water damage.