Oil and Stone Driveway East Farmingdale

Get a Beautiful Driveway for Half the Cost

Skip the expensive asphalt replacement and get the rustic charm your East Farmingdale home deserves with our oil and stone driveway installation.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Tar and Chip Driveway Benefits

What You Get with Oil and Stone

Your new oil and stone driveway gives you everything you want without the sticker shock. You get a surface that actually drains water instead of pooling it around your foundation. You get natural stone texture that looks intentional and attractive, not like a budget compromise.

The best part? You’re not dealing with months of planning and weeks of construction disruption. Most oil and stone driveways go in over a weekend, and you’re driving on them within days.

This isn’t just about saving money upfront. You’re getting a driveway that handles Long Island’s freeze-thaw cycles better than traditional asphalt because it flexes instead of cracking. When small repairs are needed down the road, you fix sections instead of replacing the whole thing.

East Farmingdale Driveway Contractors

We Know Long Island Driveways

We at All Purpose Paving have been installing oil and stone driveways across Nassau County for years. We understand what works in East Farmingdale’s soil conditions and climate.

You’re not getting a crew that learned tar and chip installation last month. Our team has the equipment and experience to get your stone coverage even and your oil application just right. Too little oil and your stones come loose. Too much and you get a messy surface that tracks into your house.

We’ve seen every soil condition and drainage challenge East Farmingdale throws at us. When we show up for your estimate, we’re looking at grade, drainage patterns, and base preparation – not just measuring square footage.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil Stone Driveway Installation Process

Here's How We Install Your Driveway

First, we prepare your base by grading and compacting the surface. This step determines how well your driveway performs long-term, so we don’t rush it. Proper base preparation prevents settling and ensures good drainage away from your foundation.

Next comes the hot oil application. We spray liquid asphalt at the right temperature and coverage rate for your specific stone size. Timing matters here – the oil needs to be hot enough to penetrate but not so hot it damages the base.

Then we spread your stone chips while the oil is still tacky. We use a chip spreader to get even coverage, then roll everything to embed the stones properly. The final step is brooming off loose stones and cleaning up your property.

Most driveways are ready for light traffic within 24 hours and full use within a few days. We’ll walk you through the curing process so you know exactly when you can park your cars without marking the surface.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Installation Details

What's Included in Your Installation

Your oil and stone driveway installation includes complete base preparation, premium liquid asphalt, and your choice of stone chip colors. We handle grading, drainage considerations, and any minor base repairs needed for a solid foundation.

We source our materials locally when possible and use stone sizes that work best for residential driveways in East Farmingdale. You’re not getting oversized chips that track into your house or undersized ones that don’t provide good traction.

Every installation includes cleanup of your property and disposal of old materials if we’re replacing an existing surface. We protect your landscaping during the work and make sure you’re completely satisfied with the finished appearance before we consider the job complete.

You’ll also get care instructions specific to oil and stone surfaces, including when to add a fresh oil coat to extend your driveway’s life. Most homeowners find the maintenance requirements much simpler than traditional asphalt.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 10-15 years in East Farmingdale’s climate. The key factors are good base preparation and using the right oil-to-stone ratio for our local conditions. You might need a fresh oil coat every 5-7 years to keep the surface looking its best and the stones properly bound. This maintenance is much less expensive than resurfacing traditional asphalt and can extend your driveway’s life significantly. The flexible nature of tar and chip surfaces actually helps them handle our freeze-thaw cycles better than rigid asphalt, which tends to crack and require more frequent major repairs.
Oil and stone driveways typically cost 50-70% less than new asphalt installation in the East Farmingdale area. While exact pricing depends on your driveway size and current condition, most homeowners save several thousand dollars choosing tar and chip over traditional asphalt. The savings come from simpler installation requirements and less expensive materials, but you’re not sacrificing durability or appearance. When you factor in the lower maintenance costs over time, the total cost of ownership is significantly less than asphalt. We provide detailed written estimates that break down all costs so you can make an informed decision for your specific situation.
Oil and stone driveways actually perform better in Long Island winters than many people expect. The textured stone surface provides excellent traction in snow and ice conditions, often better than smooth asphalt. The flexible nature of the tar and chip surface allows it to expand and contract with temperature changes without cracking like rigid surfaces do. Proper drainage is built into the installation, so you get less ice formation from standing water. Snow removal is straightforward with standard plowing equipment, though we recommend using a rubber-edged plow blade to avoid displacing stones. The key is proper installation with the right materials for our climate.
A properly installed oil and stone driveway should have minimal stone tracking after the initial settling period. During the first few weeks, you might notice some loose stones that didn’t fully embed during installation – this is normal and expected. We sweep these loose stones during our final cleanup, and any remaining ones will work themselves out with regular use. The key is using the right stone size for residential applications and applying the oil at the correct temperature and coverage rate. Oversized stones or poor oil application can cause ongoing tracking problems, which is why proper installation technique matters. Most of our East Farmingdale customers find tracking becomes negligible after the first month.
You can typically drive on your new oil and stone driveway within 24-48 hours of installation, depending on weather conditions. Hot, sunny weather speeds up the curing process, while cool or humid conditions might require an extra day. We’ll give you specific timing based on the conditions during your installation. For the first week, avoid sharp turns, heavy vehicles, or parking in the same spot repeatedly to prevent marking the surface. Motorcycle kickstands, trailer jacks, and similar concentrated loads should be avoided for the first month. We provide detailed care instructions so you know exactly what to expect during the curing period and how to protect your investment.
In many cases, we can install oil and stone over existing asphalt if the base is structurally sound and properly graded. This can save you money on removal and disposal costs while giving you a completely new surface appearance. However, the existing asphalt needs to be evaluated for major cracks, settling, or drainage problems that would affect the new installation. Severely damaged asphalt should be removed or repaired before applying tar and chip to ensure good long-term performance. We’ll assess your current driveway during the estimate and recommend the best approach for your specific situation. Sometimes minor repairs to the existing surface are all that’s needed before we can proceed with your oil and stone installation.