Oil and Stone Driveway Cherry Grove

Get Your Driveway Done Right, Finally

Professional oil and stone installation that costs less than asphalt and lasts longer than gravel.

Close-up view of interlocking concrete pavers forming a pattern on a pavement, with visible grooves and slight shadows between the bricks.

Hear from Our Customers

A spacious outdoor area with neatly arranged gray paving stones, bordered by greenery, bushes, and trees in the background.

Cherry Grove Tar Chip Installation

What You Actually Get Here

You get a driveway that handles Long Island weather without breaking your budget. No more dealing with gravel that washes away every storm or getting sticker shock from asphalt quotes.

Oil and stone gives you the durability you need with a natural look that actually improves over time. The stone surface provides excellent traction even when wet, and individual sections can be patched if needed without redoing the entire driveway.

Your installation typically takes one to two days, and you’re driving on it the same week. No waiting around for multiple coats or dealing with soft surfaces that track into your house.

Long Island Driveway Contractors

We Know Cherry Grove Driveways

We’ve been handling Long Island driveway projects for years, and we understand what works in Cherry Grove’s specific conditions. The soil here, the weather patterns, the way water moves across properties – it all matters when you’re installing a surface that needs to last.

We’re not the guys who show up with a pickup truck and some tools. We have the proper distributor trucks, rollers, and equipment to do oil and stone installation correctly the first time.

Sunlight reflects off a clean, neatly arranged brick sidewalk with a patch of green grass and a curb visible in the background.

Oil Stone Driveway Process

Here's Exactly What We Do

First, we prepare your base – whether that’s existing gravel or a new foundation. The surface needs to be properly graded and compacted because everything builds from there.

Next comes the hot liquid asphalt application using our distributor truck. This isn’t cold patch or some DIY approach – we’re talking about proper hot oil applied at the right temperature and coverage rate for Cherry Grove conditions.

Immediately after the oil application, we spread and embed the stone chips using our roller equipment. The timing here is critical – the oil needs to be hot enough to bind with the stone but not so hot that it bleeds through. Finally, we sweep off excess stone and let everything cure properly before you drive on it.

A paved driveway curves alongside a well-maintained landscaped garden with various green shrubs, bushes, and small trees under daylight.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Chip Seal Driveway Benefits

What's Actually Included In Your Project

Your oil and stone installation includes complete base preparation, proper grading for drainage, and professional application using commercial-grade equipment. We’re not cutting corners with residential-grade tools or shortcuts.

You get the right oil application rate for Long Island conditions – not too heavy where it bleeds, not too light where the stone doesn’t bind properly. The stone we use is sized correctly for residential driveways and sourced locally.

We handle cleanup completely, including sweeping excess stone and disposing of any debris. Your property looks better when we leave than when we arrived, and you have a driveway that’s ready to handle whatever Cherry Grove weather throws at it.

A modern, spacious outdoor area with grey stone tiles arranged in a geometric pattern, featuring a large triangle outlined by darker and lighter tiles, surrounded by neatly trimmed bushes and greenery.
A properly installed oil and stone driveway typically lasts 7 to 10 years in Cherry Grove conditions, sometimes longer with basic maintenance. The key factors are proper base preparation and using the right oil application rate for our local climate. Unlike gravel that needs constant attention or asphalt that can crack with freeze-thaw cycles, oil and stone holds up well to Long Island’s coastal weather patterns. You might need minor touch-ups in high-traffic areas after several years, but the overall surface remains stable and functional much longer than most people expect.
Oil and stone typically costs 40 to 60 percent less than traditional asphalt installation, especially on longer driveways where the savings really add up. For a typical Cherry Grove driveway, you’re looking at significant cost savings without sacrificing durability. The exact numbers depend on your specific driveway length and current conditions, but most homeowners are surprised at how much they can save. Keep in mind that while the upfront cost is lower, you’re still getting a professional installation that will last years, not a temporary fix that needs constant attention.
Yes, in most cases we can install oil and stone over existing gravel, but the base needs to be properly prepared first. We’ll evaluate your current gravel for proper grading, compaction, and drainage before proceeding. Sometimes we need to add material or regrade sections to ensure proper water flow and stability. The existing gravel actually provides a good foundation when it’s in decent shape, which can save you money on base preparation. However, if your gravel is severely rutted or has drainage issues, we’ll need to address those problems first to ensure your new surface performs properly.
You can typically drive on your oil and stone driveway within 24 to 48 hours after installation, depending on weather conditions and temperature. Unlike some paving methods that require extended curing time, oil and stone sets up relatively quickly. We’ll give you specific guidance based on the actual conditions during your installation. Hot weather speeds up the process, while cooler temperatures might require an extra day. We don’t recommend heavy vehicles or sharp turns for the first week, but normal passenger car traffic is fine once we give you the go-ahead.
Oil and stone actually performs excellently in wet conditions, often better than smooth asphalt surfaces. The embedded stone chips create natural texture that provides good traction even when the surface is wet. The porous nature of the surface also allows water to drain through rather than pooling on top. Given Cherry Grove’s proximity to water and occasional heavy rains, this drainage characteristic is particularly beneficial. Many of our customers specifically choose oil and stone because they were having problems with standing water on their previous driveways. The textured surface gives you confidence driving in and out during Long Island’s unpredictable weather.
Oil and stone driveways require minimal maintenance compared to other surfaces. Occasional sweeping to remove debris and leaves is helpful, and you might want to add a thin layer of stone chips in high-traffic areas after several years. Unlike asphalt that needs seal coating or gravel that needs constant regrading, oil and stone largely takes care of itself. If you notice any small areas where the stone has worn thin, those can be spot-treated without redoing the entire surface. Most Cherry Grove homeowners find the low maintenance requirements to be one of the biggest advantages, especially compared to constantly dealing with loose gravel or asphalt repairs.