Commercial Paving in Smith Point, NY

Professional Pavement That Actually Lasts

Eliminate safety risks and create lasting first impressions with commercial paving built for Long Island conditions.

A machine spreads hot asphalt onto a road surface while a worker stands nearby holding a measuring tool, preparing the area for paving.

Hear from Our Customers

A worker operates a yellow steamroller, compacting freshly laid asphalt on a road. Steam rises from the hot surface, and construction vehicles are visible in the background.

Suffolk County Asphalt Contractors

What Proper Commercial Paving Gets You

Your property becomes an asset instead of a liability. No more worrying about customers tripping on cracked pavement or dealing with water pooling after every storm.

You get a professional appearance that actually reflects the quality of your business. Clean lines, proper drainage, and surfaces that can handle Long Island’s freeze-thaw cycles without falling apart in two years.

Most importantly, you get peace of mind. When the work is done right the first time with quality materials and proper installation, you’re not dealing with emergency repairs or safety concerns down the road.

Smith Point Paving Specialists

We Know Long Island Pavement

We’ve been handling commercial asphalt projects across Suffolk County for years. We understand what works in this climate and what doesn’t.

We’re not the cheapest option, and that’s intentional. You’re investing in materials that can handle coastal weather, proper base preparation, and installation techniques that extend pavement life.

Our focus stays on getting the job done right while minimizing disruption to your business operations. We show up when scheduled, communicate clearly about timelines, and clean up properly when finished.

A construction worker wearing an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility boxes, casting a clear shadow on the ground.

Commercial Asphalt Installation Process

Here's Exactly What Happens

First, we assess your existing pavement and drainage situation. This tells us what prep work is needed and helps avoid surprises that delay the project or add costs later.

Next comes proper base preparation. This step determines how long your pavement lasts. We remove failed areas, address drainage issues, and ensure proper compaction before any asphalt goes down.

Finally, we install the asphalt in proper lifts with appropriate compaction. We coordinate timing around your business needs and handle all the details like striping and final cleanup. You get a finished surface that’s ready for traffic and built to last.

A close-up of a steamroller compacting fresh, steaming asphalt on a road surface. The lower part of the orange machine and its large metal drum are visible.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Parking Lot Paving Services

Complete Commercial Asphalt Solutions

We handle everything from small business driveways to large industrial parking areas. This includes proper base preparation, drainage solutions, ADA-compliant installations, and line striping.

Each project gets materials selected for Long Island conditions. That means asphalt mixes designed for our climate, proper thickness for your traffic loads, and installation techniques that prevent common failure points.

We also coordinate with your business schedule to minimize disruption. Most commercial projects can be phased to keep portions of your parking available, and we work around your peak business hours when possible.

A person in a striped shirt operates a yellow road roller, compacting black asphalt onto a gray road surface, as viewed from above.
Most commercial paving projects take 2-5 days depending on size and complexity. Smaller parking areas might be completed in a day, while larger industrial sites require more time for proper preparation and installation. Weather can affect timing, especially for base work and final compaction. We provide realistic timelines upfront and communicate any changes immediately. The key is proper preparation – rushing this step to save time usually means problems later.
Commercial asphalt needs thicker installation and stronger base preparation to handle heavier traffic loads and frequent turning movements. The asphalt mix itself is often different, designed for durability rather than just appearance. Drainage becomes critical with larger surface areas, and ADA compliance requirements affect slope and accessibility. Commercial projects also require more coordination for business operations and often involve striping and marking that residential work doesn’t need.
We plan projects in phases to keep portions of your parking available when possible. For smaller areas, we often schedule work during off-hours or slower business periods. Larger projects get broken into sections so you maintain some customer access throughout the process. We coordinate delivery times to avoid your peak hours and provide clear signage for alternate parking or access routes. Communication is key – we keep you updated on daily progress and any schedule changes.
New asphalt needs 24-48 hours before heavy traffic, and we recommend avoiding sharp turns or heavy loads for the first week. Sealcoating should happen after 6-12 months, then every 3-4 years depending on traffic. Crack sealing and minor repairs address small issues before they become major problems. Proper drainage maintenance prevents water damage, which is the biggest threat to asphalt longevity. We provide specific maintenance recommendations based on your traffic patterns and usage.
Freeze-thaw cycles are the biggest challenge here, causing expansion and contraction that can crack poorly installed pavement. Salt exposure from winter maintenance also affects asphalt longevity. We use mixes designed for these conditions and ensure proper drainage to prevent water infiltration. Coastal humidity and temperature swings require specific installation techniques and timing. Spring and fall are typically best for major paving work, avoiding extreme temperatures that affect material performance.
Size and thickness requirements are the primary factors, along with the amount of base preparation needed. Existing pavement condition affects removal and disposal costs. Access challenges, drainage work, and ADA compliance requirements can add complexity. Material costs fluctuate seasonally, and scheduling during peak construction season may affect pricing. We provide detailed estimates that break down these factors so you understand exactly what you’re paying for and can make informed decisions about project scope and timing.