Commercial Paving in Lake Panamoka, NY

Professional Asphalt That Actually Lasts

Durable commercial paving solutions for Suffolk County businesses who need reliable results, not costly do-overs.

A machine spreads hot asphalt onto a road surface while a worker stands nearby holding a measuring tool, preparing the area for paving.

Hear from Our Customers

A worker operates a yellow steamroller, compacting freshly laid asphalt on a road. Steam rises from the hot surface, and construction vehicles are visible in the background.

Suffolk County Asphalt Contractor

What You Get With Professional Paving

Your parking lot becomes an asset, not a liability. Smooth surfaces that handle heavy traffic without cracking or settling within the first year.

No more apologizing to customers about potholes or worrying about slip-and-fall claims. Professional asphalt installation means proper drainage, eliminating those puddles that turn into ice rinks every winter.

You get a surface built to last through Long Island’s freeze-thaw cycles. That means fewer repair calls, lower maintenance costs, and a property that actually looks like you care about your business.

Lake Panamoka Paving Experts

We Know Suffolk County Pavement

We’ve been handling commercial asphalt projects across Suffolk County for years. We understand the soil conditions here, the weather patterns that destroy cheaper work, and what it takes to build pavement that survives Long Island winters.

We’re not the cheapest option, and that’s intentional. You’re paying for proper base preparation, commercial-grade materials, and the kind of installation that doesn’t require emergency repairs six months later.

Our crews show up when scheduled, complete projects on timeline, and clean up properly. Because your business doesn’t stop for our work.

A construction worker wearing an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility boxes, casting a clear shadow on the ground.

Commercial Asphalt Installation Process

How We Handle Your Project

First, we assess your site conditions and existing pavement. This isn’t a quick walk-around – we check drainage, measure traffic loads, and identify any base issues that need addressing before new asphalt goes down.

Next comes proper preparation. We excavate to the right depth, install proper base materials, and ensure adequate drainage. This foundation work determines whether your pavement lasts two years or twenty.

Then we install the asphalt using commercial-grade materials and equipment sized for your project. Hot mix asphalt, proper compaction, and attention to grades and slopes that actually work. Finally, we handle striping, signage, and any ADA compliance requirements so you’re completely finished.

A close-up of a steamroller compacting fresh, steaming asphalt on a road surface. The lower part of the orange machine and its large metal drum are visible.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Parking Lot Paving Services

Complete Commercial Paving Solutions

Our commercial paving covers everything from small business parking areas to large industrial complexes. New installation, complete reconstruction, or overlay work depending on your existing conditions and budget.

We handle the drainage engineering that prevents water damage, the base preparation that prevents settling, and the proper asphalt thickness for your specific traffic loads. Whether you’re dealing with delivery trucks, employee parking, or customer access, we size the pavement correctly.

You also get proper striping, ADA-compliant accessibility features, and any required signage. One contractor handling the complete project means no coordination headaches between multiple trades and no finger-pointing if something needs adjustment.

A person in a striped shirt operates a yellow road roller, compacting black asphalt onto a gray road surface, as viewed from above.
Most commercial parking lots take 2-5 days depending on size and complexity. A small business lot might be completed in two days – one for preparation and base work, one for asphalt and striping. Larger projects with extensive drainage or base repair obviously take longer. Weather affects timing since we can’t install asphalt in rain or extreme temperatures. We provide realistic timelines upfront and keep you updated if conditions change the schedule.
Overlay means installing new asphalt over existing pavement that’s structurally sound but surface-damaged. It’s less expensive and faster but only works if the base is solid. Complete reconstruction involves removing old pavement, fixing drainage and base issues, then installing everything new. We recommend reconstruction when you have settling, major cracking, or drainage problems that overlay won’t fix. The right choice depends on your existing conditions and long-term plans.
Commercial asphalt thickness depends on your traffic loads and base conditions. Light commercial traffic typically needs 3-4 inches over proper base. Heavy truck traffic or industrial use requires 4-6 inches or more. The base preparation is equally important – inadequate base causes premature failure regardless of asphalt thickness. We evaluate your specific traffic patterns, soil conditions, and drainage needs to recommend the right specifications for long-term performance.
Light vehicle traffic can typically use new asphalt within 24-48 hours in good weather conditions. Heavy trucks should wait 3-5 days for full curing. Hot weather requires longer cure times, while cooler temperatures may extend the timeline. We provide specific guidance based on your project conditions and traffic needs. Emergency access can usually be arranged if needed, but normal traffic should follow our recommendations to avoid surface damage during the curing process.
Yes, we ensure commercial parking lots meet ADA accessibility requirements including proper slopes, accessible parking spaces, and compliant pathways to building entrances. This includes correct striping widths, signage placement, and surface grades that meet federal standards. ADA compliance isn’t optional for commercial properties, and non-compliance creates liability issues. We handle these requirements as part of our complete commercial paving service so you don’t need separate contractors.
New commercial asphalt should be sealcoated within 6-12 months, then every 2-3 years depending on traffic and weather exposure. Regular crack sealing prevents water infiltration that causes base damage. Line striping typically needs refreshing every 1-2 years for visibility and compliance. We also recommend periodic inspection for drainage issues or settling that could cause problems. Proper maintenance extends pavement life significantly and costs far less than premature replacement due to neglect.