Commercial Paving in Davis Park, NY

Professional Asphalt That Actually Lasts

Durable commercial paving solutions for Suffolk County businesses that need reliability, not quick fixes.

A machine spreads hot asphalt onto a road surface while a worker stands nearby holding a measuring tool, preparing the area for paving.

Hear from Our Customers

A worker operates a yellow steamroller, compacting freshly laid asphalt on a road. Steam rises from the hot surface, and construction vehicles are visible in the background.

Suffolk County Commercial Asphalt Services

Your Property Investment Protected Right

Your parking lot isn’t just pavement—it’s the first impression customers get of your business. When it’s cracked, potholed, or constantly needing patches, it sends the wrong message about your operation.

Professional commercial paving means you stop worrying about liability issues from deteriorating surfaces. No more apologizing to customers about the rough ride into your lot or scrambling to fix emergency repairs that pop up at the worst times.

You get smooth, properly graded asphalt that handles Suffolk County’s freeze-thaw cycles and heavy traffic loads. The kind of surface that looks professional, drains properly, and actually holds up to what your business throws at it year after year.

Davis Park Asphalt Contractor

We Know Long Island Commercial Properties

All Purpose Paving has been handling commercial asphalt projects across Suffolk County for years. We understand the unique challenges Long Island businesses face—from coastal weather conditions to the heavy traffic loads that come with serving dense commercial areas.

We’re not the contractor who shows up, lays some asphalt, and disappears. We stick around because our reputation in Davis Park and the surrounding communities depends on work that actually lasts.

Every project gets the same approach: proper preparation, quality materials, and installation methods that account for your specific traffic patterns and drainage needs.

A construction worker wearing an orange safety vest operates a yellow road roller on freshly paved asphalt near a metal fence and utility boxes, casting a clear shadow on the ground.

Commercial Paving Process Suffolk County

Straightforward Process, Professional Results

We start with a thorough assessment of your current pavement and drainage situation. This isn’t a quick walk-around—we’re looking at base conditions, traffic patterns, and any underlying issues that need addressing before new asphalt goes down.

Next comes proper preparation. That means excavation to the right depth, base material that can handle your traffic loads, and grading that directs water where it needs to go. Shortcuts here mean problems later, so we don’t take them.

The asphalt installation happens when conditions are right—proper temperature, dry weather, and with equipment that can handle commercial-grade work. We coordinate timing to minimize disruption to your operations while ensuring quality isn’t compromised.

A close-up of a steamroller compacting fresh, steaming asphalt on a road surface. The lower part of the orange machine and its large metal drum are visible.

Ready to get started?

Explore More Services

About All Purpose Paving | Serving all of Suffolk County, NY

Get a Free Consultation

Industrial Paving Davis Park NY

Complete Commercial Asphalt Solutions

Our commercial paving covers everything from small parking lot repairs to full industrial facility installations. You get proper base preparation, commercial-grade asphalt mix designed for your traffic loads, and installation that meets ADA compliance requirements.

We handle the permitting process with Suffolk County when needed and coordinate with other trades if your project involves utilities or drainage work. The goal is a complete solution, not just laying asphalt over existing problems.

Every project includes proper line striping, handicap accessibility features, and cleanup that leaves your property ready for business. We’re not done until your parking lot or access roads meet both your operational needs and local code requirements.

A person in a striped shirt operates a yellow road roller, compacting black asphalt onto a gray road surface, as viewed from above.
Most commercial parking lot projects take 2-5 days depending on size and complexity. The timeline includes excavation, base preparation, asphalt installation, and striping. Weather plays a big role—we won’t install asphalt in rain or when temperatures are too cold because it compromises quality. We schedule around your business needs when possible, often starting early or working sections to keep part of your lot accessible. For larger industrial projects or full reconstructions, expect 1-2 weeks. We’ll give you a realistic timeline upfront and keep you updated if conditions change anything.
Commercial paving uses thicker asphalt layers and stronger base materials because it handles heavier loads—delivery trucks, customer traffic, and constant use. The asphalt mix itself is often different, designed for durability over cost savings. Commercial projects also require ADA compliance for accessibility, proper drainage for larger surfaces, and often need permits. The equipment is bigger and the process more complex because we’re building something that needs to last under serious traffic loads. Residential driveways get lighter-duty treatment because they don’t face the same demands. It’s not just scaled-up residential work—it’s engineered differently from the ground up.
Commercial paving typically runs $3-7 per square foot depending on thickness requirements, base work needed, and site conditions. Simple overlay projects cost less than full reconstruction with new base material. Factors that affect price include current pavement condition, drainage needs, accessibility requirements, and how much excavation is required. Industrial facilities needing extra-thick asphalt for heavy equipment cost more than standard parking lots. We provide detailed estimates after assessing your specific situation because every commercial property has different requirements. The goal is giving you an accurate number upfront, not surprising you with changes later.
Yes, we regularly schedule commercial projects to work around business operations. This might mean starting very early, working evenings, or completing work in phases so part of your parking remains accessible. Some projects can be done over weekends depending on the scope. However, certain steps like final asphalt installation need to happen during optimal weather conditions regardless of timing preferences. We’ll discuss your specific needs during planning and find the best approach for your situation. The key is communication—we want to minimize impact on your customers and operations while still delivering quality work that requires proper conditions.
You can typically drive on new asphalt within 24-48 hours, but it takes about 30 days to fully cure and reach maximum strength. We recommend avoiding heavy trucks or sharp turns during the first week when possible. Hot weather means longer wait times before opening to traffic because asphalt stays soft longer. For commercial properties that can’t shut down completely, we often work in phases so you always have some parking available. The asphalt continues hardening for months, which is why you might see slight impressions from heavy vehicles initially. We’ll give you specific guidance based on your traffic needs and weather conditions during installation.
Yes, we handle Suffolk County permits when your project requires them and coordinate any necessary inspections. Commercial paving often needs permits for drainage work, utility modifications, or projects that affect public right-of-way access. We know local requirements and have working relationships with municipal offices, which speeds up the approval process. Some projects also require ADA compliance verification or environmental considerations we manage as part of the job. You shouldn’t have to navigate bureaucracy—that’s part of what you’re hiring us for. We’ll identify what permits are needed during initial planning and factor timing into your project schedule.